The Parishes of Luttons and Weaverthorpe, incorporating Helperthorpe

Luttons Parish Council – Planning applications

The following planning applications have been sent to Luttons Parish Council for their consideration. You may view these applications on the Ryedale Council Planning website by clicking here and either typing in or copying and pasting the reference shown in blue below.  You can then find documents, location maps, comments and further information by clicking on the tabs above the reference number. You may also make comments on the proposals by registering on the website.

Please note the online register is not a 24 hour service and is unavailable between 11pm and 6am.

11/00270/MFULE Land At Ling Hall Farm West Heslerton. Erection of 10no. wind turbines with a maximum height of 126m to blade tip to include micrositing and associated infrastructure including access tracks, 1no. sub-station and control building with transformers and grid connection infrastructure, underground cabling, turbine foundations, crane hardstandings, construction compound, 2no. new and 2no. upgraded site access points and 1no. 80m high permanent meteorological mast

13/00816/FUL  Little Pasture Farm Langtoft.  Erection of two storey extension to north elevation, orangery to south elevation and incorporation of part of existing attached outbuildings within the existing dwelling, together with change of use and alteration of existing barns to form 2no. three bedroom holiday cottages and 1no. two bedroom holiday cottage with associated games room and parking/amenity areas to include demolition of 2no. outbuildings.

13/00850/FUL  Land To West Pasture Road Weaverthorpe.   Erection of 1no. 40m high (overall tip height 67m) 500kw wind turbine to generate electricity for the benefit of the local community with associated crane pad, transformer kiosk, access track, vehicular access and 40.5m high temporary meteorological monitoring mast.

13/00851/FUL Land To North Of Main Road Weaverthorpe.  Erection of 1no. 40m high (overall tip height 67m) 500kw wind turbine to generate electricity for the benefit of the local community with associated crane pad, transformer kiosk, access track, vehicular access and 40.5m high temporary meteorological monitoring mast.

Speak Your Mind

*